Friday, April 15, 2011


Savannah is now re-commissioned after major MRO handling a 32 mile test run in 6 hours, 5.3 mph (4.8Kts) at 1600 RPM and 170F. The forecast called for strong wind but it was glassy all day long.
Jill caught a glimpse of Savannah retuning to the Harbor near the end of the test run. We (Iron Mike and I) ran up to the Bacarra resort at Elwood Beach and back on a glorious spring day. The oil in the water around Platform Holly made the water look like stained glass.

No comments:

Post a Comment